Hyperscaler. The biggest AI capex committer in the world.

8 projects tracked$120B+ 2026 capex
Thesis

Microsoft's AI infrastructure thesis is built around vertical integration: own the campus, own the chips, own the model. Mount Pleasant WI, Three Mile Island nuclear restart, the Crane Clean Energy Center 20-year PPA — all hand-picked to give OpenAI workloads dedicated, decarbonized base-load that's not exposed to grid queue uncertainty.

What to watch

What sets Microsoft apart is execution speed plus deal originality. The Constellation TMI restart was the first-of-its-kind nuclear PPA for AI; the entire industry has copied the template since. Watch the Crane PPA cost-per-MWh structure — it's becoming the benchmark every hyperscaler nuclear deal references.

See on the live map →How this is built
Type
Project
Capacity
Capex
Status
Datacenter
Microsoft
Microsoft
3GW
$3.3B Ph.1
operating
Datacenter
Microsoft
Microsoft
2.8GW
$8B
construction
Datacenter
Microsoft
Microsoft
1.8GW
$10B+
operating
Nuclear / SMR
Constellation
Constellation Energy
1.4GW
$3.5B est.
planned
Nuclear / SMR
Microsoft
Microsoft
835MW
$16B PPA
operating
Nuclear / SMR
Crane Clean Energy
Constellation Energy
835MW
$1.6B restart
operating
Datacenter
Microsoft
Microsoft
~600MW
€5B+
operating
Fusion
Helion Energy
Helion
50MW target
$2.2B raised
lab_active