← Back to the live mapDatacenter
Investor portfolio
Meta
Hyperion + Prometheus. Gas-turbine-first campuses at scale.
6 projects tracked$115-135B 2026 capex
Thesis
Meta is the gas-turbine standard-bearer. Hyperion in Richland Parish LA (eventually 5GW, $27B JV with Blue Owl) and Prometheus in Ohio (1GW, 2026 target) both lean on natural-gas combined-cycle generation rather than waiting for nuclear or PPAs from constrained grids. The bet: 7-year gas turbine lead times beat 15-year nuclear development cycles.
What to watch
Meta isn't ignoring nuclear — they've been in discussions on multiple PPAs — but the timeline imperative for training next-gen Llama models means power-on-demand wins now. Watch the carbon-offset accounting strategy: it's a tell for how aggressively they'll pivot when their gas-built capex starts looking outdated.
Type
Project
Capacity
Capex
Status
Meta
Meta
5GW long-term
$27B total
construction
DatacenterMeta
Meta
1.5GW
$7B
construction
Nuclear / SMRConstellation
Constellation Energy
1.1GW
$2.8B est.
planned
DatacenterMeta
Meta
1GW
$4B
construction
DatacenterMeta
Meta
800MW
$1.5B
construction
DatacenterMeta
Meta
500MW
$1B
operating